Ideas for temporary road pavement for wind and electricity construction project
Industry solutions

Ideas for temporary road pavement for wind and electricity construction project

The wind and electricity vehicle entry scene is typical for analysing key points for continuous laying of soft land, heavy vehicles, turning areas and temporary roads.

Read full text
Highlights of the case of soft land vehicles for municipal engineering
Industry solutions

Highlights of the case of soft land vehicles for municipal engineering

Municipal construction often involves the return of landfills, the concentration of soft ground after rain and short-term vehicles, which can reduce the risk of trapping through route planning and a combination of Ground Protection Mats.

Read full text
Mud surfaces after rain on construction sites — Ground Protection Mats — applied analysis
Industry solutions

Mud surfaces after rain on construction sites — Ground Protection Mats — applied analysis

The importance of pre-laying ground checks, plate connection, vehicle speed limits and maintenance checks was cited as examples of post-rain mud sites.

Read full text
Ground protection application for the warehouse workshop forklift corridor
Industry solutions

Ground protection application for the warehouse workshop forklift corridor

The workshop retrofit or short-term high-frequency handling can result in the formation of a forklift route through temporary sheeting to reduce the direct disturbance of the old floor in the construction area.

Read full text
Temporary protection programme for outdoor concert lawns
Industry solutions

Temporary protection programme for outdoor concert lawns

During stage-building, transport and evacuation, vehicles pass through the lawn repeatedly, and temporary Ground Protection Mats- can be used to create equipment and logistics corridors.

Read full text
Planning for the temporary laying and evacuation of large parking lots
Industry solutions

Planning for the temporary laying and evacuation of large parking lots

Large-scale parking requirements are of a centralized nature and the temporary ground protection programme should take into account both the entrance, the main corridor, the turn zone and the parking area.

Read full text
Mine transport dumper — Dump Truck Bed Liners — application analysis
Industry solutions

Mine transport dumper — Dump Truck Bed Liners — application analysis

For example, the bulk transport of minerals, sandstones and other materials, analysis of the configuration of the Dump Truck Bed Liners in terms of viscosity, residual reduction and protection of cars.

Read full text
A liner solution to the problem of viscous in sandstone transport vehicles
Industry solutions

A liner solution to the problem of viscous in sandstone transport vehicles

When the water content of sandstones varies significantly, car residues increase and the liner design should be determined in combination with material, compartment structure and discharge.

Read full text
Dump Truck Bed Liners-needs analysis of wet earth transport scenes
Industry solutions

Dump Truck Bed Liners-needs analysis of wet earth transport scenes

The wet soil is easily adhesive to the floor and the side wall, and the selection of the lining requires confirmation of the water content of the material, the size of the vehicle and the actual wear and tear area.

Read full text
Garbage and liner configuration of the offload vehicle at the quarry
Industry solutions

Garbage and liner configuration of the offload vehicle at the quarry

The Quarries transport is accompanied by shocks, frictions and duplicate discharges, and the liner configuration should be assessed around high wear and tear areas and installation structures.

Read full text
The mobile crane is applied to the ground.
Industry solutions

The mobile crane is applied to the ground.

The compacted ground appears to be stable, but the local backfill, water content and maximum single leg load still need to be verified to determine the area and thickness of Outrigger Pads.

Read full text
Reference to the concrete pump construction leg support programme
Industry solutions

Reference to the concrete pump construction leg support programme

Pumping vehicles need to focus on the surface, foot position and operating space when carrying out the legs, which is used to expand the area of exposure and to help spread the pressure.