The temporary parking lot appears to be light, but the entrances, charge points, bends and exits bear a large number of duplicates.(b) The low-speed direction of vehicles produces horizontal cutting, and tyres tend to roll up wet grass;Once the pattern has developed, the back car will travel along the same groove and the problem will spread rapidly.The most critical entry points may still fall into the car if parking spaces are only available and the connecting lanes and queue areas are neglected.The plan shall determine the width of the main channel and the platoon size according to the peak hour traffic, include the bend, foot and landing areas as enhanced positions, and set the lead person to avoid a sharp turn in situ.During the event, the earth on the side of the board was continuously seen as being squeezed out and misplaced, cleaned and adjusted in a timely manner.The temporary parking lot and the overflowing parking area site should set clear standards for the discontinuation of “entry queues and low-speed turns to cause rapid destruction of local grasslands”, such as continued ramping, incomplete support, extended deposition, visible slippage of vehicles or loose links.Unusual isolation and unloading were detected, and then the floors were repaired or reconfigured, and temporary pads were prohibited in carrying conditions.The head of the mission may not resume operations until he or she has been qualified to do so, and records of disposal are maintained.
Application for temporary parking and spilling parking sites



Applications for temporary parking lots and for common items in spill areas
Description of the business processes, vehicle equipment, ground conditions and the project cycle.
The parking lot and the overflowing parking area are often used for exhibitions, sports events, festivals, peaks, commercial openings, construction personnel parking and temporary expansion of the park.
Parking applications focus not only on carrying but also on stream organization, pedestrian safety, drainage, night identification and recovery on the ground after the event has ended.Frequent turn-overs of vehicles can cut the grass, run over repeatedly on the same path in line, and the entrance and ramp are most easily disabled after rainfall.Temporary plates should form continuous, clear surfaces, do not create stumbling points on the edges, and the surface stripes should be balanced with tyre scratches and pedestrians.The programme needs to determine the scope of the laying based on projected traffic, site slopes, days of stay, weather forecasts and time limits for evacuation sites, rather than simply covering the entire site.
Common Issues
For the actual work in the temporary parking lot and the overflowing area, the reasons for their formation, possible impact, focus of inspections and management methods are indicated separately.
The viewers and drivers are often unfamiliar with temporary sites and are prone to error into unpaved areas at night, during rain or during congestion.The lack of visible marking of the edges of the sheet, the connectors, the surface rises and drains may result in tripping, tires rushing out or twirling the chassis.Parking programmes require the separation of pedestrian paths from driveways and the installation of lighting, reflective boundaries, speed limits and barrier-free routes;The end of the plate should be connected to the original ground and the connection cannot be highlighted.Staff members should conduct a full-line walk-by check each time they are opened and find that the edges, water accumulation or contamination are immediately disposed of, and emergency exit and fire escape routes must be kept operational and cannot be filled with temporary parking.In response to the “security problems caused by mixed-car movements, slabs and night-time identification”, the temporary parking lot and overflow area project should also include the results of the check in the pre-class confirmation and handover records, specifying who is responsible for the release, who is responsible for the inspection, what deposition or relocation must be discontinued.Retroactive recording of photographs, measurements and usages will make it possible to distinguish ground-based changes, operational deviations from product damage and avoid repetition of the same problem between different groups.
Large-scale pavement may alter surface water flow, and if the site itself is low-lying or drainage vents covered by vehicles, garbage and sheeting, rainwater accumulates under the plate and softens the grass-roots level.(a) The concentration of vehicles away after the end of the activity is the period of maximum traffic load in the passageway;If the plates sink or move at this time, the evacuation site will be severely congested.The programme should retain the direction of natural drainage, set inspection and clean-up gates at low points and reduce unrelated vehicles during rainfall.The retreat site cannot be randomly dismantled by the vehicle and should be recovered from closed areas, cleaned, numbered and checked on the lawn, so that the remaining routes remain continuous.The treatment of the “short interactivity of rainfall, drainage blockages and evacuation zones” cannot be limited to one successful pass, but also covers the maximum load, maximum frequency, worst weather and evacuation phases.It is recommended that representative positions be selected for trial, that ground, vehicle or equipment data be recorded and that the scope, connection and frequency of maintenance be adjusted to the results;Changes in conditions have resulted in the confirmation that early experience will not be applied directly to the entire temporary garage and overflow area project.
Solution Recommendations
The route, the grass-roots, the support or the unloading of the material is addressed first, and the corresponding products are recommended according to the work situation.
First, the one-way cycle will be designed using the floor plan and projected traffic, identifying entry line areas, main driveway, parking branch, pedestrian access, fire route and emergency exit.Priority coverage of high-frequency lanes, turnovers and drop-off positions, with parking spaces being treated in a hierarchical manner according to ground conditions;Pre-painted cutting of high-intensity debris, flatting of pits and keeping the drains open.The plates are continuously connected from the hard-quality entrance to the interior, the edges are re-reflected, and the minibus and service vehicles are piloted before they are opened.During the campaign, patrol personnel and spare panels were arranged, large vehicles were restricted after the rain and the evacuation sites were recovered in the order of closure of the area.
The scene is centred on HDPE Ground Protection Mats-, which recognizes thickness, texture and route width based on the most unfavourable pattern of passenger vehicles, buses and logistics trucks.The protection of the lawn would benefit from the selection of specifications that would facilitate removal and reuse and reduce the upturn of the soil in conjunction with the isolation layer;Where stage, lighting or catering equipment uses legs, a separate configuration of Crane Outrigger Pads may be made in the equipment area, but Outrigger Pads is not used in a continuous driveway.The procurement volume should be accounted for on the basis of the length of the driveway, the width of the bend, the enhancement of the entrance and the back-up ratio, together with the preparation of connectors, edge markings and cleaning tools to form a complete parking operation programme.
Ground Protection Mats
For the establishment of temporary vehicle access, protection of the original ground and dispersion of the wheel; specific thickness, size, texture and connection will be determined by vehicle and base level.
Crane Outrigger Pads
For the purpose of increasing the area of the foot exposure and reducing average ground pressure; must be calculated in conjunction with maximum single-leg reaction, original foot size and a permissible ground pressure.
Manufacturing
01Ground Protection Mats Production and bulk delivery
From smooth-truck road formation to vehicle load validation, to mass stacking, packaging and loading.





02Crane Outrigger Pads Processing and Inspection
CNC processes, surface structural checks, attachment configurations and packagings showing circles, squares—Outrigger Pads.





Information proposed before request for quotations
The more complete the information, the easier it is to quickly determine the appropriate size, thickness, structure, quantity and customization.
- Type and weight of vehicle/equipment
- Ground type versus hardness
- Length, width and turn of route
- Projected number of acquisitions
- Port of destination/delivery area

Need for temporary parking and spilling parking area project options?
We continue to assess the actual conditions of work for the distribution of site photographs, equipment/vehicle parameters, application conditions, quantity and port of destination.
Industry application cases
Browse the typical applications of Ground Protection Mats-, Dump Truck Bed Liners- and Outrigger Pads-- in different industries, click on pictures to enter the corresponding industry pages.








