Jiachuang Plastics Blog

Energy Power Renewables | Engineering Plastics Guides

Temporary access and equipment support for wind, photovoltaic, storage, electrical installations construction and overhaul projects.

View All Categories

Project guidance

About Energy Power Renewables | Engineering Plastics Guides

Read energy power renewables guidance from Jiachuang Plastics, including ground protection mats selection, project conditions and practical specifications..

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project.

View HDPE ground protection mats product details →
Energy, electricity and new sources of energy

Energy, electricity and new sources of energy

201articles
How do you wash the mud-painted pavements after the repairs?
Energy, electricity and new sources of energy

How do you wash the mud-painted pavements after the repairs?

With regard to the site of emergency repairs of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic focused on “How to wash the mud-painted pavements after the recovery has been completed”, analysing the rising costs of secondary crushing and restoration as a result of an error in the sequence of the retreat, and describing the elements of the selection, installation, inspection, restoration and procurement of the suture, floor and vehicle operating space through representative trial workshops.

Look for details
How can emergency access be isolated from public access?
Energy, electricity and new sources of energy

How can emergency access be isolated from public access?

In the area of emergency repair of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic is concerned with “How emergency routes are isolated from public access”, the lack of analysis leads to a mismatch between specifications and quantities and field conditions, and the use of approved road maps, numbers and inspection logs to manage the selection, installation, inspection, recovery and procurement elements of site changes.

Look for details
How does power recovery go across a ditch?
Energy, electricity and new sources of energy

How does power recovery go across a ditch?

In the area of emergency repair of electrical circuits following heavy rains, typhoons or floods, the topic focused on “How power recovery crosses the canals of the roadside”, analysing the temporary changes in construction routes that allowed vehicles to enter unprotected areas, and describing the selection, installation, inspection, recovery and procurement elements planned for the most disadvantaged vehicles, complete wheels and weather changes.

Look for details
What kind of ground protection would be needed to repair the reverse area?
Energy, electricity and new sources of energy

What kind of ground protection would be needed to repair the reverse area?

In the field of emergency repairs of electrical circuits following heavy rains, typhoons or floods, this topic focuses on “what kind of ground protection is needed for retrofitted vehicle areas”, analyses the extent to which sub-points overload or uneven deposition changes the level of equipment and indicates the retention of back-up panels and connections, and the selection, installation, inspection, restoration and procurement elements for timely containment repairs of unusual areas.

Look for details
What about ice on the surface of the pavement when it's cold?
Energy, electricity and new sources of energy

What about ice on the surface of the pavement when it's cold?

The topic of “What about ice on the surface of the pavement during cryogenic repairs” is focused on the site of emergency repairs of electrical circuits in the aftermath of heavy rains, typhoons or floods. The analysis of loose connections, drainage congestion or pollution reduces the actual operational status and describes the selection, installation, inspection, restoration and procurement elements of the minimum effective area of the leg pads based on maximum reversibility and durability.

Look for details
Why can't a muddy tunnel be built on a thin sheet?
Energy, electricity and new sources of energy

Why can't a muddy tunnel be built on a thin sheet?

In the area of emergency repair of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic focuses on “Why should the mudslides not be covered by a thin sheet” and analyses the fall in the ground-based load and the emergence of pumping muds or faults in the aftermath of rainfall and describes the reverse removal and retention of the emergency route in the order of exit of equipment to the final selection, installation, inspection, recovery and procurement elements.

Look for details
How do you set the boundaries for night-time power recovery?
Energy, electricity and new sources of energy

How do you set the boundaries for night-time power recovery?

In the area of emergency repairs of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic focuses on “How night-time power recovery routes set up borders”, analyses how static, brakes and turnovers significantly increase local stress, and describes the selection, installation, inspection, recovery and procurement elements of a speed limit, a ban on in situ wheeling and the placement of a person-in-command for heavy vehicles.

Look for details
What about the temporary parking area for emergency power trucks?
Energy, electricity and new sources of energy

What about the temporary parking area for emergency power trucks?

The topic of “How to lay temporary parking areas for emergency electric power vehicles” is of concern to the site of emergency electrical circuit repairs in the aftermath of heavy rains, typhoons or floods. The analysis of test conditions results in error when the nominal tonnage is directly compared with different conditions and indicates the selection, installation, inspection, restoration and procurement elements of the job description, test basis and restrictions in the request for and acceptance documents.

Look for details
Will the cable recovery route be opened immediately after the flood?
Energy, electricity and new sources of energy

Will the cable recovery route be opened immediately after the flood?

With regard to the emergency recovery of electrical circuits in the wake of heavy rains, typhoons or floods, the topic focused on the “immediate opening of retrenchment cables in the aftermath of a flood”, analysing the secondary crushing and recovery costs caused by a ceremonial error in the sequence of the evacuation site and describing the elements of the selection, installation, inspection, restoration and procurement of the sutures, floor and vehicle operating space through representative trial workshops.

Look for details
What should we do when the crane's leg falls?
Energy, electricity and new sources of energy

What should we do when the crane's leg falls?

With regard to the emergency recovery of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic is concerned with “what to do with the fall in the legs of the cranes” and the lack of analytical information leads to a mismatch between specifications, quantities and field conditions, as well as to the use of approved road maps, numbers and inspection records to manage the selection, installation, inspection, recovery and procurement elements of site changes.

Look for details
How do electric recovery vehicles enter the mud after heavy rains?
Energy, electricity and new sources of energy

How do electric recovery vehicles enter the mud after heavy rains?

The topic focuses on “How electricity recovery vehicles enter the mud after a storm” and analyses the looseness of connections, drainage congestion or pollution to reduce their operational status, as well as the selection, installation, inspection, recovery and procurement elements of the minimum effective area of leg mats based on maximum reversibility and durability.

Look for details