
What parameters are to be provided prior to the procurement of pavements for the transmission project?
The topic, which revolves around the work of the taki, line-laying and overhaul along the transmission line, focuses on the “parameters to be provided before the procurement pavement of the transmission project”, analyses the error caused by the different test conditions, but directly compares the nominal tonnage, and describes the selection, installation, inspection, restoration and procurement elements for the timely containment restoration of the abnormal area by retaining the back-up and connector.
Look for details





















