Jiachuang Plastics Blog

Mining Quarry Drilling | Engineering Plastics Guides

Heavy transport of mines, quarrying operations, drilling equipment entry and high wear and tear applied information.

View All Categories

Project guidance

About Mining Quarry Drilling | Engineering Plastics Guides

Read mining quarry drilling guidance from Jiachuang Plastics, including ground protection mats selection, project conditions and practical specifications..

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project.

View HDPE ground protection mats product details →
Mines, quarrying and drilling

Mines, quarrying and drilling

103articles
What are the points of the sea packaging and acceptance for the mine project?
Mines, quarrying and drilling

What are the points of the sea packaging and acceptance for the mine project?

Cross-border transportation around pavement boards, leg pads and skateboards to resolve the reasons for loose bundling, humid contamination or quantity differences that affect progress and to give recommendations on the selection, installation, inspection and procurement of packaging, marking, cabinet lists, photographs and receiving and inspection processes to be specified in the contract.

Look for details
How do we plan for the quantity of goods to be supplied for containerized purchases in remote mining areas?
Mines, quarrying and drilling

How do we plan for the quantity of goods to be supplied for containerized purchases in remote mining areas?

Quantified cabinets around MOQ and on-site replenishment cycles are long, and the reasons for the possible lack of wear and tear and expansion surplus in procurement against current requirements are analysed and recommendations are given for the selection, installation, inspection and procurement of quantities determined in combination with containerization programmes, batches of installation, spare parts ratios and storage capacity.

Look for details
What parameters are to be provided before the mine project procurement pavements?
Mines, quarrying and drilling

What parameters are to be provided before the mine project procurement pavements?

With regard to the need for suppliers to match mine vehicles and foundations, the resolution provides only the reasons why the total weight of the vehicle cannot be judged by the wheel, route and condition, as well as recommendations for the selection, installation, inspection and procurement of the submitted axle load, tyres, ground, slopes, turns, temperature and length of laying.

Look for details
How is the temporary road spare parts inventory for mining sites set?
Mines, quarrying and drilling

How is the temporary road spare parts inventory for mining sites set?

Discrepancies around the consumption of connectors, replacement panels and handling tools, and the breakdown of the low level of work in the inventory and the reasons for the excessive use of remote storage, as well as selection, installation, inspection and procurement recommendations based on failure rates, the length of critical routes and the setting of floors and floors for replenishment cycles.

Look for details