Jiachuang Plastics Blog

Energy Power Renewables | Engineering Plastics Guides

Temporary access and equipment support for wind, photovoltaic, storage, electrical installations construction and overhaul projects.

View All Categories

Project guidance

About Energy Power Renewables | Engineering Plastics Guides

Read energy power renewables guidance from Jiachuang Plastics, including ground protection mats selection, project conditions and practical specifications..

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project.

View HDPE ground protection mats product details →
Energy, electricity and new sources of energy

Energy, electricity and new sources of energy

201articles
How should the case of the transformer transport project be reset?
Energy, electricity and new sources of energy

How should the case of the transformer transport project be reset?

In the context of the extension of transformer stations, the transport of transformer transformers and equipment overhauls, the topic is concerned with “how the transformer transport project case should be redisposed” by analysing the drop in ground-based loads and the occurrence of pumping muds or faults in the aftermath of rainfall, as well as the selection, installation, inspection, recovery and procurement elements that are planned to be continuously covered by the most adverse vehicle, the complete wheel and weather change.

Look for details
What detection information is required for the procurement of transformer pavements?
Energy, electricity and new sources of energy

What detection information is required for the procurement of transformer pavements?

In the context of the extension of transformer stations, the transport of transformer transformers and equipment overhauls, the topic is concerned with “what detection information is required for the procurement of transformer plant pavements”, analysing the significant increase in local pressure caused by static, brake and turnover, and specifying the elements for the retention of backup panels and connections, and the selection, installation, inspection, recovery and procurement of timely containment repairs to unusual areas.

Look for details
How does the transformer project record the original state of the ground?
Energy, electricity and new sources of energy

How does the transformer project record the original state of the ground?

In the context of the extension of transformer stations, the transport of transformer transformers and equipment overhauls, the topic focused on “How the transformer plant project records the original state of the ground”, analysing how repeated vehicle traffic forms deep and destroys the grass-roots level, and providing an indication of the selection, installation, inspection, restoration and procurement elements of the minimum effective area of the leg pads based on maximum reversibility and durability.

Look for details
How quickly can temporary roads be dismantled after equipment repairs?
Energy, electricity and new sources of energy

How quickly can temporary roads be dismantled after equipment repairs?

In the context of the extension of transformer stations, transformer transport and equipment overhauls, the topic is concerned with “how fast to dismantle temporary roads after equipment repairs have been completed”, analysing the error caused by the different test conditions, but directly comparing the nominal tonnage, and indicating the selection, installation, inspection, restoration and procurement elements for first treatment of drainage and soft spots, then laying and running from the stabilization end.

Look for details
What are the risks involved in the sub-legging of the power plant?
Energy, electricity and new sources of energy

What are the risks involved in the sub-legging of the power plant?

In the context of the extension of the transformer plant, the transport of transformers and equipment overhauls, the topic is concerned with the “risks on which the substrates of the transformer station contain bias”, analysing the secondary crushing and recovery costs resulting from the error in the sequence of the divers, and indicating the reverse removal and retention of the emergency route in the order of exit of the equipment to the final selection, installation, inspection, recovery and procurement points.

Look for details
What happens when the transformer pavements get oiled?
Energy, electricity and new sources of energy

What happens when the transformer pavements get oiled?

In the context of the extension of transformer stations, the transport of transformers and equipment overhauls, the subject is concerned about “how to process oils on transformer pavements”, the lack of analytical information leads to a mismatch between specifications and quantities and field conditions, as well as to the selection, installation, inspection, recovery and procurement elements for speed limits, the prohibition of in situ wheeling and the placement of special command for heavy vehicles.

Look for details
How does the temporary road for the power plant coordinate with the fire escape route?
Energy, electricity and new sources of energy

How does the temporary road for the power plant coordinate with the fire escape route?

With regard to the extension of transformer stations, the transport of transformer transformers and equipment repairs, the topic focused on “How the temporary transformer roads are coordinated with the fire escape route”, analysing the temporary changes in the construction route that have brought vehicles into unprotected areas and indicating the selection, installation, inspection, recovery and procurement elements for the line segments, turn areas, docking positions and surfaces, respectively.

Look for details
How do you protect a suction car and a service car?
Energy, electricity and new sources of energy

How do you protect a suction car and a service car?

In the context of the extension of transformer stations, the transport of transformers and equipment overhauls, this topic is concerned with “How to protect sorbent vehicles and service vehicles”, analysing the extent to which the feeder has been overloaded or even-silent to change the level of the equipment and indicating the selection, installation, inspection, restoration and procurement elements of the request for quotations and acceptance documents that indicate the basis for testing and the conditions of limitation.

Look for details
How can the plant dump avoid local deposition?
Energy, electricity and new sources of energy

How can the plant dump avoid local deposition?

In the context of the extension of transformer stations, the transport of transformers and equipment overhauls, the topic focuses on “How to avoid local deposition of transformer plant equipment dumps”, analyses the reduction of physical use through loose connections, drainage congestion or pollution, and describes the selection, installation, inspection, restoration and procurement elements of suture, floor and vehicle operating space through representative trial workshops.

Look for details
How do you design the transformer multi-axis transport turn?
Energy, electricity and new sources of energy

How do you design the transformer multi-axis transport turn?

In the context of the extension of the transformer station, the transport of transformers and the overhaul of equipment, this topic is concerned with “How the transformer multi-axis transport turn area is designed”, analysing the lack of support on the edge of the road leading to the bending and crushing of the sheet and indicating the selection, installation, inspection, restoration and procurement elements for the approved road map, numbering and inspection logs to manage the site changes.

Look for details
What about the vehicular passages above the substation cable ditch?
Energy, electricity and new sources of energy

What about the vehicular passages above the substation cable ditch?

In the context of the extension of transformer stations, the transport of transformers and equipment overhauls, this topic focuses on the “how to handle vehicular channels above the transformer stations cable ditches”, analysing the decline in ground-based loads and the emergence of pump muds or faults in the aftermath of rainfall, as well as the selection, installation, inspection, restoration and procurement elements that are planned to be continuously covered by the most adverse vehicle, the complete wheel and weather changes.

Look for details
Can you use a leg pad on the ground?
Energy, electricity and new sources of energy

Can you use a leg pad on the ground?

With regard to the extension of transformer stations, the transport of transformer transformers and equipment repairs, the topic focused on “Is it possible to use leg pads on the ground of the transformer stations' rubble”, analysing the significant increase in local pressure caused by static, brake and turnover, and indicating the retention of spare panels and connectors, as well as the selection, installation, inspection, restoration and procurement elements for timely containment restoration of unusual areas.

Look for details
How do you check the edges of the pavement when you're at the end of the night?
Energy, electricity and new sources of energy

How do you check the edges of the pavement when you're at the end of the night?

In the context of the extension of transformer stations, the transport of transformer transformers and equipment overhauls, this topic focuses on “How night-time retrofitting of transformer stations check the edges of pavements”, analyses how vehicle traffic is repeated into deep spaces and destroys the grass-roots level, and describes the selection, installation, inspection, recovery and procurement elements of the least effective area of the leg mats based on maximum reversibility and durability.

Look for details
How do you set up a temporary work platform when switches are replaced?
Energy, electricity and new sources of energy

How do you set up a temporary work platform when switches are replaced?

In the context of the extension of transformer stations, transformer transport and equipment overhauls, the topic is concerned with “How the temporary work platform is to be built when switch equipment is replaced”, analysing the error caused by the different test conditions, but directly comparing the nominal tonnage, and indicating the selection, installation, inspection, restoration and procurement elements for first treatment of drainage and soft points, and then laying and running from the stabilization end.

Look for details
How do you check the soft spots after the rain?
Energy, electricity and new sources of energy

How do you check the soft spots after the rain?

In the context of the extension of transformer stations, the transport of transformer transformers and equipment overhauls, the topic is concerned with “how soft spots are checked after rain on transformer stations”, analysing the secondary crushing and recovery costs due to the error in the sequence of the fallout, and explaining the reverse removal of the emergency route in the order of exit of the equipment and the retention of the emergency route to the final selection, installation, inspection, recovery and procurement points.

Look for details