Temporary access and equipment support for wind, photovoltaic, storage, electrical installations construction and overhaul projects.

View All Categories

Project guidance

About Energy Power Renewables | Engineering Plastics Guides

Read energy power renewables guidance from Jiachuang Plastics, including ground protection mats selection, project conditions and practical specifications..

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project.

View HDPE ground protection mats product details →
Energy, electricity and new sources of energy

Energy, electricity and new sources of energy

201articles
What about the lack of road supplies for the remote wind project?
Energy, electricity and new sources of energy

What about the lack of road supplies for the remote wind project?

The theme, which revolves around wind, voltage and other energy project camps that are far from hardened roads, focuses on “What to do about the lack of road supplies for remote wind-light projects”, analyses the looseness of connections, drainage congestion or pollution to reduce actual usage, and describes the selection, installation, inspection, recovery and procurement elements, calculated separately for the line segments, turn areas, docking positions and the surface.

Look for details
How does the tundra project pavement board work?
Energy, electricity and new sources of energy

How does the tundra project pavement board work?

The topic, which revolves around camps for wind, photovoltaic and other energy projects that are far from the hardened road, focuses on “how to use the pavement boards of the tundra energy project”, analyses the lack of support on the edges of the road, which leads to the bending and crushing of the sheet, and describes the selection, installation, inspection, restoration and procurement elements of the job description, test basis and conditions in the request and acceptance documents.

Look for details
How can the parking areas of the heavy-rain energy projects be drained?
Energy, electricity and new sources of energy

How can the parking areas of the heavy-rain energy projects be drained?

On the subject of wind, electricity, photovoltaic and other energy project camps, which are located far from the hardened roads, the topic focuses on “How to drain the parking area of the project in rain-fed areas”, analyses the decline in the base load and the emergence of pumping muds or faults in the field following rainfall, and describes the selection, installation, inspection, restoration and procurement elements of the suture, floor and vehicle operating space through representative trial workshops.

Look for details
How can remote project fuel vehicle corridors reduce pollution risks?
Energy, electricity and new sources of energy

How can remote project fuel vehicle corridors reduce pollution risks?

The topic, which revolves around wind, voltage and other energy project camps located far from the hardened roads, focuses on “How remote refuelling vehicle routes reduce pollution risks”, analyses static, brakes and turnovers, which significantly increase local stress, and describes the selection, installation, inspection, recovery and procurement elements of the approved road map, numbering and inspection logs to manage site changes.

Look for details
What do you care about the temporary stacking of cables and equipment?
Energy, electricity and new sources of energy

What do you care about the temporary stacking of cables and equipment?

The topic, which revolves around camps for wind, photovoltaic and other energy projects located far from the hardened road, focuses on “what to notice about the temporary stacking of cables and equipment boxes”, analyses vehicle traffic over and over again and destroys the grass-roots level, and describes the selection, installation, inspection, recovery and procurement elements that are planned to be covered on a continuous basis according to the most unfavourable vehicle, complete wheel and weather change.

Look for details
How can the energy project container depot protect the ground?
Energy, electricity and new sources of energy

How can the energy project container depot protect the ground?

The topic, which revolves around wind, photovoltaic and other energy project camps located far from the hardened road, focuses on “how energy project container depots protect the ground”, analysing the error caused by different test conditions, but directly comparing the nominal tonnage, and specifying the selection, installation, inspection, restoration and procurement elements for the timely containment restoration of unusual areas by retaining spare panels and connectors.

Look for details
How is the remote project camp service vehicle road paved?
Energy, electricity and new sources of energy

How is the remote project camp service vehicle road paved?

With regard to the wind, photovoltaic and other energy project camps, which are located far from the hardened roads, the topic is concerned with “How to pave the remote project camp service vehicle roads”, analysing the secondary crushing and recovery costs due to the incorrect sequence of the evacuation sites, and providing an indication of the selection, installation, inspection, restoration and procurement elements of the least effective leg pads based on maximum reversibility and local durability.

Look for details
How can desert energy project vehicles avoid falling?
Energy, electricity and new sources of energy

How can desert energy project vehicles avoid falling?

On the subject of wind, photovoltaic and other energy project camps, which are located far from the hardened roads, the focus is on “how desert energy project vehicles can avoid the fall”, the lack of analytical information leads to a mismatch between specifications, quantities and field conditions, and indicates the selection, installation, inspection, recovery and procurement elements for first treatment of drainage and soft points, and then for laying and piloting from the stabilization end.

Look for details
How are equipment corridors for new energy projects in mountain regions built?
Energy, electricity and new sources of energy

How are equipment corridors for new energy projects in mountain regions built?

With regard to the wind, photovoltaic and other energy project camps, which are located far from the hardened road, the topic is “How to construct a new energy project in the mountains”, analysing the temporary changes in the construction route that have brought vehicles into the unprotected area and indicating the reverse removal of the emergency route and the retention of the emergency route in the order in which the equipment was withdrawn to the final selection, installation, inspection, recovery and procurement points.

Look for details
How do remote energy projects plan temporary parking areas?
Energy, electricity and new sources of energy

How do remote energy projects plan temporary parking areas?

The topic, which revolves around camps for wind, photovoltaic and other energy projects that are far from the hardened road, focuses on “How to plan temporary parking areas for remote energy projects” and analyses feed points for overloading or uneven deposition to change the level of equipment, as well as on the selection, installation, inspection, recovery and procurement elements for setting speed limits, prohibiting in situ cycling and arranging for the exclusive command of heavy vehicles.

Look for details
What time data should be recorded in cases of power outages?
Energy, electricity and new sources of energy

What time data should be recorded in cases of power outages?

In the area of emergency repair of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic focuses on “the time data to be recorded in the case of electricity outages”, analyses the lack of support on the edges of the road leading to plate bending and crushing, and describes the selection, installation, inspection, restoration and procurement elements for first treatment of drainage and soft spots, then for laying and piloting from the stable end.

Look for details
How do we arrange for the inventory to be purchased for the power recovery cabinet?
Energy, electricity and new sources of energy

How do we arrange for the inventory to be purchased for the power recovery cabinet?

In the area of emergency repair of electrical circuits following heavy rains, typhoons or floods, the topic focuses on “How to arrange for inventory for the procurement of electrical recovery cabinets”, analyses the decline in the base load and the emergence of pumping mud or faults in the aftermath of rainfall, and describes the reverse removal and retention of the emergency route in the order of exit of equipment to the final selection, installation, inspection, recovery and procurement elements.

Look for details
Will it be possible to continue using temporary roads after they have been damaged?
Energy, electricity and new sources of energy

Will it be possible to continue using temporary roads after they have been damaged?

In the area of emergency repair of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic is concerned with “the continued use of temporary roads after they have been damaged”, analysing the significant increase in local stress caused by static, brakes and turnovers, and indicating the selection, installation, inspection, recovery and procurement elements for speed limits, prohibition of in-situ wheeling and placement of special command for heavy vehicles.

Look for details
How does the emergency warehouse store a mattress and a connection?
Energy, electricity and new sources of energy

How does the emergency warehouse store a mattress and a connection?

In the area of emergency repair of electrical circuits following heavy rains, typhoons or floods, this topic focuses on “how emergency warehouses can store leg pads and connectors”, analyses how vehicle traffic is repeated to create deep ground and destroys the grass-roots level, and describes the selection, installation, inspection, recovery and procurement elements, calculated separately for the line segments, turn areas, docking slots and operating surfaces.

Look for details
How many pavements do the power recovery project require?
Energy, electricity and new sources of energy

How many pavements do the power recovery project require?

In the area of emergency repair of electrical circuits in the aftermath of heavy rains, typhoons or floods, the topic is concerned with “how much of the pavement is needed for power recovery projects”, analysing the error caused by the different test conditions but directly comparing the nominal tonnage and indicating the selection, installation, inspection, restoration and procurement elements in the request for proposals and acceptance documents.

Look for details