Jiachuang Plastics Blog

Port Logistics Airport Industrial Sites | Engineering Plastics Guides

Vehicle traffic, equipment operations and ground protection at ports, logistics parks, airport expansion and industrial sites.

View All Categories

Project guidance

About Port Logistics Airport Industrial Sites | Engineering Plastics Guides

Read port logistics airport industrial sites guidance from Jiachuang Plastics, including ground protection mats selection, project conditions and practical specifications..

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project.

View HDPE ground protection mats product details →
Ports, logistics, airports and industrial sites

Ports, logistics, airports and industrial sites

202articles
What data should be recorded in the ground protection project cases for plant workshops
Ports, logistics, airports and industrial sites

What data should be recorded in the ground protection project cases for plant workshops

The data on cases surrounding equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant indicate the risks associated with vehicle loads, ground conditions, pavements and leg mating, installation of inspection, recovery and request for quotation parameters, and assist the project team in controlling wheel pressure, metal belts, fallout and in situ movement that may result in injury to coatings, sews or permanent marks in vulnerable areas.

Look for details
Criteria for receiving and inspection of ground protection at plant workshops
Ports, logistics, airports and industrial sites

Criteria for receiving and inspection of ground protection at plant workshops

The receiving and inspection standards around equipment relocation workshops, production line retrofitting areas and factory entrances indicate the risks associated with vehicle loads, ground conditions, pavement and leg mat selection, installation of inspection, recovery and request for quotation parameters, and assist the project team in controlling wheel pressure, metal belts, fallers and in situ shifts that may result in bruises, crushing stitches or leaving permanent marks in vulnerable areas.

Look for details
How does the plant's ground protection back-up pavement fit?
Ports, logistics, airports and industrial sites

How does the plant's ground protection back-up pavement fit?

The back-up configuration of the equipment relocation workshop, production line retrofitting area and factory entrance and entrance/exit, which describes the risks associated with vehicle loads, ground conditions, pavement and leg mat selection, installation of inspection, recovery and request for quotation parameters, and helps the project team to control the wheel pressure, metal belts, fallers and in situ shifts that may result in injury to coatings, sews or permanent marks in vulnerable areas.

Look for details
How to establish usage records for ground protection at plant workshops
Ports, logistics, airports and industrial sites

How to establish usage records for ground protection at plant workshops

Records of the use of vehicle loads, ground conditions, pavements and leg mats, installation of inspection, recovery and request for quotation parameters around equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant are used to assist the project team in controlling the risks associated with possible scratching of coatings, sews or permanent marks in vulnerable areas.

Look for details
What are the most common problems at the ground protection site in the factory workshop?
Ports, logistics, airports and industrial sites

What are the most common problems at the ground protection site in the factory workshop?

The common problems surrounding equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant indicate the risks associated with vehicle loads, ground conditions, pavements and leg mating, installation of inspection, recovery and request for quotation parameters, and assist the project team in controlling wheel pressure, metal belts, fallers and in situ shifts that may cause injury to coatings, sews or permanent marks in vulnerable areas.

Look for details
How ground protection in plant workshops compares different supply options
Ports, logistics, airports and industrial sites

How ground protection in plant workshops compares different supply options

A comparison of the suppliers of equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant indicates the risks associated with vehicle loads, ground conditions, pavements and leg mating, installation of inspection, recovery and request for quotation parameters, and helps the project team to control the wheel pressure, metal belts, fallout and in situ movement that may result in injury to coatings, sews or permanent marks in vulnerable areas.

Look for details
Parameters to be prepared for ground protection request for plant workshops
Ports, logistics, airports and industrial sites

Parameters to be prepared for ground protection request for plant workshops

Query parameters around equipment relocation workshops, production line retrofitting areas and factory entrances, indicating the risks associated with vehicle loads, ground conditions, pavement and leg mat selection, installation of inspection, recovery and request for quotation parameters, and helping the project team to control the wheel pressure, metal belts, fallers and in situ shifts that may cause damage to the coating, crushing stitches or leave permanent marks in vulnerable areas.

Look for details
How to design the demolition and recycling process for ground protection at workshops
Ports, logistics, airports and industrial sites

How to design the demolition and recycling process for ground protection at workshops

Dismantling recovery around equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant, indicating the risks associated with vehicle loads, ground conditions, pavement and leg mating, installation of inspection, recovery and request for quotation parameters, and helping the project team to control the wheel pressure, metal belts, fallout and in situ movement that may result in injury to coatings, sews or permanent marks in vulnerable areas.

Look for details
How to manage ground protection multi-equipment cross-operations in plant workshops
Ports, logistics, airports and industrial sites

How to manage ground protection multi-equipment cross-operations in plant workshops

Cross-cutting operations around equipment relocation workshops, production line retrofitting areas and factory entrances, describing the risks associated with vehicle loads, ground conditions, pavement and leg mating, installation of inspection, recovery and request for quotation parameters, and helping the project team to control the wheel pressure, metal belts, fallers and in situ shifts that may cause damage to the coating, sews or permanent marks in vulnerable areas.

Look for details
The safety of the plant ' s workshop ground protection night operations
Ports, logistics, airports and industrial sites

The safety of the plant ' s workshop ground protection night operations

Night operations around equipment relocation workshops, production line retrofitting areas and entrance/exit points to the risks associated with vehicle loads, ground conditions, pavement and leg mat selection, installation of inspection, recovery and request for quotation parameters, to help the project team control the wheel pressure, metal belts, fallers and in situ shifts that may result in injuries to coatings, sews or permanent marks in vulnerable areas.

Look for details
How ground protection at plant workshops can reduce the cost of ground rehabilitation
Ports, logistics, airports and industrial sites

How ground protection at plant workshops can reduce the cost of ground rehabilitation

The cost of repairing the equipment relocation workshop, production line retrofitting area and factory entrance/entry points, which describes the risks associated with vehicle loads, ground conditions, pavement and leg mating, installation of inspection, recovery and request for quotation parameters, and helping the project team to control the wheel pressure, metal belts, fallout and in situ movement that may cause damage to coatings, sews or permanent marks in vulnerable areas.

Look for details
How to set up a daily inspection frequency for ground protection at the factory workshop
Ports, logistics, airports and industrial sites

How to set up a daily inspection frequency for ground protection at the factory workshop

The frequency of inspections around equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant, indicating the risks associated with vehicle loads, ground conditions, pavement and leg mat selection, installation of inspection, recovery and request for quotation parameters, and helping the project team to control the wheel pressure, metal belts, fallout and in situ movement to or from areas of vulnerability, which may cause damage to the coating, crushing stitches or leave permanent marks.

Look for details
Number of purchases accounted for by ground protection at plant workshops
Ports, logistics, airports and industrial sites

Number of purchases accounted for by ground protection at plant workshops

Accounting for the number of vehicles ' loads, ground conditions, pavements and leg mat selections, installation of inspection, recovery and request for quotation parameters around equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant, and helping the project team to control the risks associated with the potential for injury to coatings, sews or permanent marks in vulnerable areas.

Look for details
Organization of installation and vehicle movements for ground protection at plant workshops
Ports, logistics, airports and industrial sites

Organization of installation and vehicle movements for ground protection at plant workshops

Schedules around the installation of equipment relocation workshops, production line retrofitting areas and entrances to and exit from the plant, describing the risks associated with vehicle loads, ground conditions, pavements and leg mating, installation of inspection, recovery and request for quotation parameters, and assisting the project team in controlling wheel pressure, metal belts, fallout and in situ movement that may cause injury to coatings, sews or permanent marks in vulnerable areas.

Look for details
How to balance surface protection in plant workshops with drainage and ground protection
Ports, logistics, airports and industrial sites

How to balance surface protection in plant workshops with drainage and ground protection

Water drainage protection around equipment relocation workshops, production line retrofitting areas and entrance/exit points to the risks associated with vehicle loads, ground conditions, pavement and leg mat selection, installation of inspection, recovery and request for quotation parameters, and to help the project team to control wheel pressure, metal belts, fallers and in situ shifts that may cause injury to coatings, sews or permanent marks in vulnerable areas.

Look for details