Jiachuang Plastics Blog

Energy Power Renewables | Engineering Plastics Guides

Temporary access and equipment support for wind, photovoltaic, storage, electrical installations construction and overhaul projects.

View All Categories

Project guidance

About Energy Power Renewables | Engineering Plastics Guides

Read energy power renewables guidance from Jiachuang Plastics, including ground protection mats selection, project conditions and practical specifications..

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project.

View HDPE ground protection mats product details →
Energy, electricity and new sources of energy

Energy, electricity and new sources of energy

201articles
How can the restoration be assessed in the case of park pipeline maintenance?
Energy, electricity and new sources of energy

How can the restoration be assessed in the case of park pipeline maintenance?

With regard to the construction sites for public utilities such as water supply, drainage, gas and municipal pumping stations, the topic focused on “How the restoration effects are assessed in the case of park line maintenance”, analysing the extent to which the feeder has been overloaded or even downfalled to change the level of the equipment and indicating the selection, installation, inspection, recovery and procurement elements of the site changes to be managed with approved road maps, numbering and inspection records.

Look for details
What are the concerns regarding the procurement of containerized utility projects?
Energy, electricity and new sources of energy

What are the concerns regarding the procurement of containerized utility projects?

In connection with the construction of public utility sites such as water supply, drainage, gas and municipal pumping stations, the topic focuses on “What are the points of interest in the procurement of containerized public utility projects” and analyses the ease of connection, drainage congestion or pollution to reduce actual usage, and describes the selection, installation, inspection, recovery and procurement elements that are planned to be covered on a continuous basis by the most disadvantaged vehicles, complete wheels and weather changes.

Look for details
How do you classify the municipal recycling pavements?
Energy, electricity and new sources of energy

How do you classify the municipal recycling pavements?

In connection with the construction of public utilities such as water supply, drainage, gas and municipal pumping stations, the topic is concerned with “How to classify the road pavements for the recycling of municipal projects”, analysing the lack of support on the edges of the roads, which leads to the bending and crushing of the sheets, and indicating the retention of spare plates and connections, as well as the selection, installation, inspection, restoration and procurement elements for the timely containment and repair of unusual areas.

Look for details
How does a utility contractor set up a pavement bill?
Energy, electricity and new sources of energy

How does a utility contractor set up a pavement bill?

With regard to the construction sites for utilities such as water supply, drainage, gas and municipal pumping stations, the topic focuses on “How utility contractors can set up pavement billings”, analyses the drop in the ground-based load following rainfall and the occurrence of pumping muds or errors, and describes the selection, installation, inspection, restoration and procurement elements of the minimum effective area of the leg pads based on maximum reversibility and durability.

Look for details
How can we repair the fall of the public utility road after the rain?
Energy, electricity and new sources of energy

How can we repair the fall of the public utility road after the rain?

With regard to the construction of public utilities such as water supply, drainage, gas and municipal pumping stations, the topic focused on “How to repair the falloff of the construction of public utilities after rain”, analysing static, brakes and turnovers, which resulted in a marked increase in local stress, and describing the selection, installation, inspection, restoration and procurement elements for first treatment of drainage and soft spots, and then laying and piloting from the stable end.

Look for details
Why must the city hang a leg pad be in full contact?
Energy, electricity and new sources of energy

Why must the city hang a leg pad be in full contact?

In connection with the construction of public utilities such as water supply, drainage, gas and municipal pumping stations, the topic is concerned with “why do municipalities have to have full access to the hanger pads”, analysing the re-routing of vehicles into deep vehicles and undermining the grass-roots level, and explaining the reverse removal of emergency routes in the order in which the equipment was withdrawn and the retention of emergency routes to the final selection, installation, inspection, restoration and procurement points.

Look for details
How do utilities work at night to manage temporary access?
Energy, electricity and new sources of energy

How do utilities work at night to manage temporary access?

With regard to the construction of public utilities such as water supply, drainage, gas and municipal pumping stations, the topic is concerned with “how public services can manage temporary accesses at night” and analyses different test conditions but directly compares the miscalculation caused by the nominal tonnage, as well as the selection, installation, inspection, restoration and procurement elements of a speed limit, a ban on in-situ wheeling and the placement of a person in command for heavy vehicles.

Look for details
Can you use small-sized pavements in a narrow neighborhood?
Energy, electricity and new sources of energy

Can you use small-sized pavements in a narrow neighborhood?

With regard to the construction of public utility sites such as water supply, drainage, gas and municipal pumping stations, the topic is concerned with the “capability of small-size pavements in narrow neighbourhoods”, analysing the secondary crushing and recovery costs resulting from the error in the sequence of the divers, and indicating the selection, installation, inspection, restoration and procurement elements for the line segments, turn areas, docking positions and workspaces, respectively.

Look for details
How does the public utility construction board road and asphalt road transition?
Energy, electricity and new sources of energy

How does the public utility construction board road and asphalt road transition?

With regard to the construction sites around utilities such as water supply, drainage, gas and municipal pumping stations, the topic focused on “How to make the transition between the public utility construction panels and asphalt roads”, the lack of analytical information led to a mismatch between specifications, quantities and conditions on the ground, and indicated the selection, installation, inspection, restoration and procurement elements for the request for proposals and acceptance documents, indicating the basis of the tests and the conditions of the tests.

Look for details
How is the pavement paved while the sewage repair vehicle leaks?
Energy, electricity and new sources of energy

How is the pavement paved while the sewage repair vehicle leaks?

With regard to the construction sites around public utilities such as water supply, drainage, gas and municipal pumping stations, this topic focuses on “Cleaning of the pavements of sewage repair vehicles while leaking”, analyses the temporary changes in the construction routes that bring vehicles into unprotected areas and describes the selection, installation, inspection, restoration and procurement elements of the suture, floor and vehicle operating space through representative trial workshops.

Look for details
How can public utility temporary roads be separated from pedestrian roads?
Energy, electricity and new sources of energy

How can public utility temporary roads be separated from pedestrian roads?

In connection with the construction of public utility sites such as water supply, drainage, gas and municipal pumping stations, the topic focuses on “How public utility temporary roads are separated from pedestrian accesses”, analyses the extent to which the feeder has been overloaded or even downfalled to change the level of the equipment and describes the selection, installation, inspection, recovery and procurement elements of the site to be managed with approved road maps, numbers and inspection records.

Look for details
How can public utility vehicles on the roadside be stabilized?
Energy, electricity and new sources of energy

How can public utility vehicles on the roadside be stabilized?

With regard to the construction sites for public utilities such as water supply, drainage, gas and municipal pumping stations, the topic focused on “How to stabilize the flow of public utility vehicles on the roadside”, analysing the looseness of connections, drainage congestion or pollution to reduce actual usage and indicating the selection, installation, inspection, recovery and procurement elements that are planned to be covered on a continuous basis in accordance with the most adverse vehicle, complete wheel and weather change.

Look for details
How can the construction in the green belt reduce the pressure of the roots?
Energy, electricity and new sources of energy

How can the construction in the green belt reduce the pressure of the roots?

With regard to the construction sites of public utilities such as water supply, drainage, gas and municipal pumping stations, the topic focused on “How construction in the green belt can reduce the pressure of the roots”, analysing the lack of support on the edges of the road, which led to the bending and crushing of the sheet, as well as the retention of the back-up panels and connections, and the selection, installation, inspection, restoration and procurement elements for the timely containment and repair of the abnormal areas.

Look for details
How is the width of public utility roads determined?
Energy, electricity and new sources of energy

How is the width of public utility roads determined?

In connection with the construction of public utilities such as water supply, drainage, gas and municipal pumping stations, this topic focuses on “how wide the public service can be fixed” and analyses the decline in the base load and the emergence of pumping mud or faults in the field following rainfall, as well as the selection, installation, inspection, restoration and procurement elements of the minimum effective area of the leg pads based on maximum reversibility and durability.

Look for details
How can the underground network be built to avoid vehicle crushing back into filling areas?
Energy, electricity and new sources of energy

How can the underground network be built to avoid vehicle crushing back into filling areas?

In the context of the construction of public utilities such as water supply, drainage, gas and municipal pumping stations, the topic focuses on “How the underground network works to avoid vehicle crushing back into filling areas”, analyses static, brakes and turn-overs, which significantly increase local stress, and describes the selection, installation, inspection, restoration and procurement elements for first treatment of drainage and soft points, and then for laying and piloting from the stabilization end.

Look for details