Jiachuang Plastics Blog

Energy Power Renewables | Engineering Plastics Guides

Temporary access and equipment support for wind, photovoltaic, storage, electrical installations construction and overhaul projects.

View All Categories

Project guidance

About Energy Power Renewables | Engineering Plastics Guides

Read energy power renewables guidance from Jiachuang Plastics, including ground protection mats selection, project conditions and practical specifications..

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project.

View HDPE ground protection mats product details →
Energy, electricity and new sources of energy

Energy, electricity and new sources of energy

201articles
How can the bridge cover of the energy equipment transport route be verified?
Energy, electricity and new sources of energy

How can the bridge cover of the energy equipment transport route be verified?

With regard to heavy liftings and transport sites around transformers, wind and large electrical equipment, the topic focuses on “Verification of bridge content on energy equipment transport routes”, analysing static, brakes and turnovers, which significantly increase local stress, as well as describing the elements of job description, test basis and condition selection, installation, inspection, restoration and procurement in the request and acceptance documents.

Look for details
Can a heavy-lifted leg pad be stacked on multiple layers?
Energy, electricity and new sources of energy

Can a heavy-lifted leg pad be stacked on multiple layers?

With regard to heavy cranes and transport sites around transformers, wind machines and large-scale electrical equipment, the topic focused on “Is it possible to stack multiple layers of the heavy-lifted leg pads” and analysed the re-routing of vehicles into deep space and the destruction of the grass-roots level, as well as the selection, installation, inspection, restoration and procurement elements of the suture, floor and vehicle operating space through representative trial workshops.

Look for details
Can the equipment dump be shared with the transport corridor?
Energy, electricity and new sources of energy

Can the equipment dump be shared with the transport corridor?

With regard to heavy liftings and transport sites around transformers, wind and large-scale electrical equipment, the topic is concerned with “Sharedness of the equipment discharge area and the transport corridor”, analysing the error caused by the different test conditions but directly comparing the nominal tonnage and describing the selection, installation, inspection, recovery and procurement elements of the site change with approved road maps, numbers and inspection records.

Look for details
Why should the temporary road for heavy transport be piloted?
Energy, electricity and new sources of energy

Why should the temporary road for heavy transport be piloted?

With regard to heavy cranes and transport sites around transformers, wind turbines and large-scale electrical equipment, the topic is concerned with “Why temporary roads for heavy transport should be tested first”, analysing the secondary crushing and recovery costs resulting from the error in the order of the evacuation site, and describing the selection, installation, inspection, restoration and procurement elements planned for the most disadvantaged vehicles, complete wheels and weather changes.

Look for details
When does the suspension run into continuous rainfall stop?
Energy, electricity and new sources of energy

When does the suspension run into continuous rainfall stop?

With regard to heavy cranes and transport sites around transformers, wind machines and large power equipment, the topic is concerned with “when the suspension operation will stop with continuous rainfall”. The lack of analytical information leads to a mismatch between specifications, quantities and conditions on the ground, as well as to the retention of back-up panels and connections, and the selection, installation, inspection, recovery and procurement elements for timely containment repairs in unusual areas.

Look for details
Can you use a gravel under your leg to find a flat?
Energy, electricity and new sources of energy

Can you use a gravel under your leg to find a flat?

With regard to heavy cranes and transport sites around transformers, wind turbines and large-scale electrical equipment, the topic focused on the “capability of using gravel under the leg pads to level the ground”, analysing the temporary changes in the construction route, which resulted in vehicles entering unprotected areas and indicating the selection, installation, inspection, restoration and procurement elements of the least effective area of the leg pads based on maximum reversibility and durability.

Look for details
Why monitor the deposition when the crane is down?
Energy, electricity and new sources of energy

Why monitor the deposition when the crane is down?

With regard to heavy cranes and transport sites around transformers, wind and large power equipment, the topic focuses on “Why are depositions monitored when cranes are set up” and analyses feed points for overloading or uneven deposition to change the level of equipment, and describes the selection, installation, inspection, recovery and procurement elements for treatment of drainage and soft points, and then for preparation and commissioning from the stabilization end.

Look for details
What about the wrong sutures on the heavy transport road?
Energy, electricity and new sources of energy

What about the wrong sutures on the heavy transport road?

With regard to heavy cranes and transport sites around transformers, wind and large-scale electrical equipment, the topic is concerned with “how to treat faulty sutures of heavy transport road boards”, analysing loose connections, drainage congestion or pollution to reduce the actual operational status, and explaining the reverse removal and retention of emergency routes in the order of exit of equipment to the final selection, installation, inspection, recovery and procurement elements.

Look for details
How do we calculate the width of the multi-axis transport vehicle turn zone?
Energy, electricity and new sources of energy

How do we calculate the width of the multi-axis transport vehicle turn zone?

With regard to heavy cranes and transport sites around transformers, wind turbines and large power equipment, the topic focused on “How to calculate the width of the multi-axis transporter turn zone”, analysing the lack of support on the edge of the road leading to plate bending and crushing, and indicating the selection, installation, inspection, restoration and procurement elements for speed limits, the prohibition of in situ wheeling and the placement of individual command for heavy vehicles.

Look for details
How is the temporary road for heavy transformer transport accepted?
Energy, electricity and new sources of energy

How is the temporary road for heavy transformer transport accepted?

With regard to heavy cranes and transport sites around transformers, wind turbines and large-scale electrical equipment, the topic focused on “How to accept temporary roads for transport of heavy transformers”, analysing the drop in ground-based loads and the occurrence of pumping mud or error tables following rainfall, and indicating the selection, installation, inspection, recovery and procurement elements for the line segments, turn areas, docking slots and surfaces, respectively.

Look for details
How do you fit the support points with multiple cranes?
Energy, electricity and new sources of energy

How do you fit the support points with multiple cranes?

With regard to heavy cranes and transport sites around transformers, wind and large power equipment, the topic is concerned with “how many cranes will work with cranes to set up feed points”, analysing how static, brakes and turnovers will significantly increase local pressure and indicating the selection, installation, inspection, restoration and procurement elements of the condition, test basis and condition in the request and acceptance documents.

Look for details
What's the risk of a crane leg near a ditch?
Energy, electricity and new sources of energy

What's the risk of a crane leg near a ditch?

With regard to heavy cranes and transport sites around transformers, wind machines and large-scale electrical equipment, the topic is concerned with “the risk of a crane leg approaching a gutter”, analysing the re-routing of vehicles into deep ground and destroying the grass-roots level, and describing the selection, installation, inspection, recovery and procurement elements of the suture, floor and vehicle operating space through representative trial workshops.

Look for details
The thicker the leg mattress, the higher the load?
Energy, electricity and new sources of energy

The thicker the leg mattress, the higher the load?

With regard to heavy liftings and transport sites around transformers, wind machines and large power equipment, the subject is concerned with “the greater the thickness of the leg mats, the higher the load,” and analyses the error caused by the different test conditions, but directly comparing the nominal tonnage, and describes the selection, installation, inspection, restoration and procurement elements of the approved road map, numbering and inspection logs to manage the site changes.

Look for details
How does the maximum retroactivity of the leg translate the area of the leg cushion?
Energy, electricity and new sources of energy

How does the maximum retroactivity of the leg translate the area of the leg cushion?

With regard to heavy lifting and transport sites around transformers, wind turbines and large-scale electrical equipment, the topic is concerned with “how the maximum retroactivity of the leg translates the area of the leg cushion”, analysing the secondary crushing and recovery costs due to the error in the order of the fallout field, and describing the selection, installation, inspection, restoration and procurement elements planned to be covered on a continuous basis by the most adverse vehicle, the complete wheel and weather changes.

Look for details
How can the ground be assessed before the heavy lifting of energy projects?
Energy, electricity and new sources of energy

How can the ground be assessed before the heavy lifting of energy projects?

With regard to heavy cranes and transport sites around transformers, wind turbines and large power equipment, the topic focused on “how to assess the ground before heavy lifting of energy projects”, the lack of analytical information led to a mismatch between specifications, quantities and conditions on the ground, as well as to the retention of back-up panels and connections, and the selection, installation, inspection, recovery and procurement elements for timely containment repairs in unusual areas.

Look for details