
Ground Protection Mats
Temporary road and heavy equipment ground protection solutions
View Product Details →Focus on Ground Protection Mats, Dump Truck Bed Liners and Crane Outrigger Pads. Based on Ultra-High-Molecular-Weight Polyethylene (UHMWPE)/High-Density Polyethylene (HDPE) materials and crowding out, modeling, CNC machining capabilities, provide product and customized support to global engineering clients.
The website product centre retains only three product lines that are directly related to current business priorities and avoids fragmentation of product positioning.

Temporary road and heavy equipment ground protection solutions
View Product Details →
Reduction of viscos, improvement of offloading and protection of carriages for grinding
View Product Details →
Expansion of support area to assist lifting and engineering equipment to stabilize operations
View Product Details →The first page gives priority to nine key client industries, and clicks on representative scenes can be accessed on the corresponding industry page to view project applications, common problems and solutions proposals.

Service construction sites, infrastructure development, ground transportation and access to heavy equipment have helped to establish temporary access routes and protect the original ground.
View Industry Solution →
For road digging, network repair, bridge maintenance and municipal equipment operations, combining rapid laying, passage and product protection.
View Industry Solution →
Heavy transport, quarrying, drilling and equipment overhauls to mine areas, respectively, address complex road, car sticky and support problems.
View Industry Solution →
It is applied to farm machine access, harvesting transport, grazing land feed passage and plantation maintenance to reduce mudslides and direct soil crushing.
View Industry Solution →
For wood transport in forest areas, access to equipment in mountainous areas and remote project corridors, with a focus on wetlands, ramps and relief efforts at relatively remote locations.
View Industry Solution →
Service wells, long pipeline lines, site installation and remote line construction to support vehicle traffic, equipment rigs and material transport.
View Industry Solution →
Support for stage, light sound, entry of logistics vehicles and lawn protection, taking into account fire escape routes, rain operations and quick evacuation sites.
View Industry Solution →
It is suitable for the rapid installation of vehicles, exhibition equipment and temporary camps to allow for repeat laying, support, inventory and trans-shipment across the site.
View Industry Solution →
For desert energy, beach activities, gas and gas repairs and rescue vehicle access, with a focus on improving access and equipment support on loose sand.
View Industry Solution →
The product manual shows that Jiachuang Plastics- is a professional manufacturer with advanced crowding out and compression molding-equipment, CNC machining-centres, customizing products in different shapes according to customer needs and with more than 10 years of industry experience.
Product selection around vehicles, equipment, ground or materials for transport.
Customisation is assessed by size, structure, colour, surface and drawings.
Squeeze, simulate, cut in concert with CNC machining.
Check and prepare for packing and export delivery as required by the order.
The form, processing, testing, stacking and packing links are viewed by product and are taken from the actual production and delivery processes.
From smooth-truck road formation to vehicle load validation, to mass stacking, packaging and loading.





CNC processes, surface structural checks, attachment configurations and packagings showing circles, squares—Outrigger Pads.





Prepare the plates according to the type of vehicle, the size of the vehicle and the transportation material, the calibration, the pore review and the packing delivery.





Homepage news is synchronized with the blog. Filter by category; 5 articles are shown per page.

The topic, which revolves around the work of the taki, line-laying and overhaul along the transmission line, focuses on the “parameters to be provided before the procurement pavement of the transmission project”, analyses the error caused by the different test conditions, but directly compares the nominal tonnage, and describes the selection, installation, inspection, restoration and procurement elements for the timely containment restoration of the abnormal area by retaining the back-up and connector.
Look for details
In the context of the work on the Taki, discharge and overhaul along the transmission line, the subject is concerned with “the estimation of the number of panels to be paved for the transmission of electricity”, the analysis of which results in an increase in the cost of secondary crushing and restoration as a result of an error in the sequence of the extraction field, and an indication of the selection, installation, inspection, restoration and procurement elements of the least effective area of the leg pads based on maximum reversibility and durability.
Look for details
With regard to the work on the Taki, Wireless and Repairs along the line of transmission, the topic is concerned with “How temporary roads are to be dismantled when line works are withdrawn”, and the lack of analysis leads to a mismatch between specifications, quantities and field conditions, and indicates the selection, installation, inspection, restoration and procurement elements to process drainage and soft points before laying out and piloting from the stabilization end.
Look for details
With regard to the work on the use of taki, line discharge and overhaul along the transmission line, the topic focused on “How to deal with thawing of the winter power supply construction”, analysing the temporary changes in the construction route that led vehicles to unprotected areas and indicating the reverse removal of the emergency route and the retention of the emergency route in the order in which the equipment was withdrawn to the final selection, installation, inspection, recovery and procurement points.
Look for details
With regard to the work on the Taki, discharge and overhaul along the transmission line, the subject is concerned with “the frequency of inspection of the transmission construction road connections”, analysing the re-alignment of the level of equipment by overloading or uneven deposition at the branch points, as well as the selection, installation, inspection, recovery and procurement elements for the setting of speed limits, the prohibition of in-situ wheeling and the placement of special command for heavy vehicles.
Look for detailsSend your application, dimensions, quantity, vehicle or equipment details, and destination port. We will review suitable options for your project.
The provision of vehicle or equipment information, the environment in which it is used, the quantity and the port of destination on which it is possible to organize the product specifications and tailoring more appropriately for the project.
The more complete the information, the easier it will be to follow up on the product and the work.
Project guidance
Explore Jiachuang Plastics ground protection mats, UHMWPE dump truck liners and crane outrigger pads for project access, haulage and lifting..
Share the application, dimensions, equipment loads, quantity and destination so the manufacturer can review a suitable material and fabrication route.
View engineering plastic products product details →