
Ground Protection Mats
Temporary road and heavy equipment ground protection solutions
View Product Details →Focus on Ground Protection Mats, Dump Truck Bed Liners and Crane Outrigger Pads. Based on Ultra-High-Molecular-Weight Polyethylene (UHMWPE)/High-Density Polyethylene (HDPE) materials and crowding out, modeling, CNC machining capabilities, provide product and customized support to global engineering clients.
The website product centre retains only three product lines that are directly related to current business priorities and avoids fragmentation of product positioning.

Temporary road and heavy equipment ground protection solutions
View Product Details →
Reduction of viscos, improvement of offloading and protection of carriages for grinding
View Product Details →
Expansion of support area to assist lifting and engineering equipment to stabilize operations
View Product Details →The first page gives priority to nine key client industries, and clicks on representative scenes can be accessed on the corresponding industry page to view project applications, common problems and solutions proposals.

Service construction sites, infrastructure development, ground transportation and access to heavy equipment have helped to establish temporary access routes and protect the original ground.
View Industry Solution →
For road digging, network repair, bridge maintenance and municipal equipment operations, combining rapid laying, passage and product protection.
View Industry Solution →
Heavy transport, quarrying, drilling and equipment overhauls to mine areas, respectively, address complex road, car sticky and support problems.
View Industry Solution →
It is applied to farm machine access, harvesting transport, grazing land feed passage and plantation maintenance to reduce mudslides and direct soil crushing.
View Industry Solution →
For wood transport in forest areas, access to equipment in mountainous areas and remote project corridors, with a focus on wetlands, ramps and relief efforts at relatively remote locations.
View Industry Solution →
Service wells, long pipeline lines, site installation and remote line construction to support vehicle traffic, equipment rigs and material transport.
View Industry Solution →
Support for stage, light sound, entry of logistics vehicles and lawn protection, taking into account fire escape routes, rain operations and quick evacuation sites.
View Industry Solution →
It is suitable for the rapid installation of vehicles, exhibition equipment and temporary camps to allow for repeat laying, support, inventory and trans-shipment across the site.
View Industry Solution →
For desert energy, beach activities, gas and gas repairs and rescue vehicle access, with a focus on improving access and equipment support on loose sand.
View Industry Solution →
The product manual shows that Jiachuang Plastics- is a professional manufacturer with advanced crowding out and compression molding-equipment, CNC machining-centres, customizing products in different shapes according to customer needs and with more than 10 years of industry experience.
Product selection around vehicles, equipment, ground or materials for transport.
Customisation is assessed by size, structure, colour, surface and drawings.
Squeeze, simulate, cut in concert with CNC machining.
Check and prepare for packing and export delivery as required by the order.
The form, processing, testing, stacking and packing links are viewed by product and are taken from the actual production and delivery processes.
From smooth-truck road formation to vehicle load validation, to mass stacking, packaging and loading.





CNC processes, surface structural checks, attachment configurations and packagings showing circles, squares—Outrigger Pads.





Prepare the plates according to the type of vehicle, the size of the vehicle and the transportation material, the calibration, the pore review and the packing delivery.





Homepage news is synchronized with the blog. Filter by category; 5 articles are shown per page.

In the context of the interim road demolition, cleaning, recycling and site delivery phase of the energy project, the topic is concerned with “what consists of the cost of ground rehabilitation”, the lack of analytical information leading to a mismatch between specifications and quantities and field conditions, and the selection, installation, inspection, recovery and procurement elements of a speed limit, a ban on in situ wheeling and the placement of individual commands for heavy vehicles.
Look for details
In the context of the interim road demolition, cleaning, recycling and site delivery phase of the energy project, the topic focused on “How the energy project records the state of the ground before entering the site”, analysing the temporary changes in the construction route that led the vehicle to an unprotected area and indicating the selection, installation, inspection, recovery and procurement elements for the line segments, turn areas, docking slots and surfaces, respectively.
Look for details
In the context of the interim road demolition, cleaning, recycling and site delivery phase of the energy project, the topic focuses on “how to examine cracks and deformations after the retrieving of the pavement”, analyses the extent to which the feeder has been overloaded or uneven downfalls to change the level of the equipment and describes the elements of the description of the work, the selection of the test basis and the conditions of the test, installation, inspection, restoration and procurement in the request and acceptance documents.
Look for details
In the context of the interim road demolition, cleaning, recycling and site delivery phase of the energy project, the topic focuses on “How to manage sewage for cleaning pavements”, analysing the reduction of physical use through loose connections, drainage congestion or pollution, as well as the selection, installation, inspection, restoration and procurement elements of suture, floor and vehicle operating space through representative trial workshops.
Look for details
In the context of the interim road demolition, cleaning, recycling and site delivery phase of the energy project, the topic focused on “Was the mud sheet cleaned on site or back-to-back”, analysing the lack of support on the edge of the road, which led to the bending and crushing of the sheet, and describing the selection, installation, inspection, restoration and procurement elements for the approved road map, numbering and inspection logs for site changes.
Look for detailsSend your application, dimensions, quantity, vehicle or equipment details, and destination port. We will review suitable options for your project.
The provision of vehicle or equipment information, the environment in which it is used, the quantity and the port of destination on which it is possible to organize the product specifications and tailoring more appropriately for the project.
The more complete the information, the easier it will be to follow up on the product and the work.
Project guidance
Explore Jiachuang Plastics ground protection mats, UHMWPE dump truck liners and crane outrigger pads for project access, haulage and lifting..
Share the application, dimensions, equipment loads, quantity and destination so the manufacturer can review a suitable material and fabrication route.
View engineering plastic products product details →