Protecting Grass During Temporary Outdoor Events

The stage-building, material transport and audience service vehicles would put a concentrated pressure on the lawn and temporary ground protection would reduce direct crushing.

Contact Us

Project guidance

Key points: Protecting Grass During Temporary Outdoor Events

Separate staging and service vehicle routes to reduce concentrated wheel loads on turf.

The useful specification depends on axle loads, the ground under the mats, drainage, turns and repeat vehicle passes. Confirm connection details and site layout against the actual project. Specify grass protection matting to suit the site and equipment conditions described above.

View HDPE ground protection mats product details →
article-25
Abstract of article:The stage-building, material transport and audience service vehicles would put a concentrated pressure on the lawn and temporary ground protection would reduce direct crushing.

How do you define the situation?

The temporary activity site is divided between the total mass of the vehicle and the force per axle, followed by ground composition, water-bearing status and basic capacity.Ground protection of the site is to accommodate both the entry and exit of construction vehicles and the time of landscape restoration and evacuation, and logistics routes and personnel areas should be planned separately in advance.How the temporary activity site is recast, stage-building, material transport and viewer service vehicles can put a concentrated pressure on the lawn and temporary ground protection can reduce direct crushing.The temporary activity site will be marked first by the mileage, vertical slope conditions, sharp bend positions and cross-crossing points, with additional traffic density, operational speed and multiple shifts.

How do you get the advance information?

The temporary activity site will first measure the thickness of the sheeting, the surface-proof skating pattern and the inter-board interface structure, which will then be processed in a transition from on-site drainage, ground-based soft spots and edges.The temporary activity site provides for the receipt and inspection of the total mass of the vehicle and the accounts of the per-axis intake, the mileage of the operating route, the condition of the slope, the sharp turning position and the cross-crossing point.(b) How temporary sites are replaced without ground composition, water-bearing status and basic stress capacity;Lack of traffic density, operating speed and multiple shifts, with no old values.How the temporary activity site will be preceded by a list of surface composition, water-bearing status and basic stress capacity, and then re-check the thickness of the sheeting, the surface-proof skating pattern and the inter-board inter-branch connection structure.How the temporary venue could be less communicationable.

Solutions

The first step in the temporary activity site is how the total mass of the vehicle and the strength of each axle is managed, the surface composition, water-bearing state and basic stress capacity of the second tube, and the third step is to look at the mileage of the operational route, the conditions of the vertical slope, the acute bend position and the cross-cutting point.The temporary activity site will first look at traffic density, operating speeds and multiple shifts, and then make up the thickness of the sheet, the slider pattern and the inter-board connection structure.The site was inspected and the site drainage, ground-based soft spots and border transitions were properly processed.How temporary activity sites are reviewed in the event of changes in the mileage of operational routes, vertical slope conditions, sharp bends and cross-crossing points.How the temporary activity site is to be split between the thickness of the sheet, the slab-proof pattern and the inter-board interface structure, and then check the total mass of the vehicle and the strength of each axis.How to leave the results in value at the temporary site.

Solutions Implementation List:
  • The first step in the temporary activity site is how the total mass of the vehicle is checked against the total strength of each axle to the composition of the ground, the water-bearing state and the basic stress capacity, and the establishment of an on-site baseline.
  • The second step of the temporary activity site is to determine the configuration using the mileage of the operational route, the condition of the vertical slope, the sharp bend position and traffic point and traffic density, the speed of the operation and whether there have been multiple shifts to determine the configuration, with small-scale validations.
  • The third step of the temporary activity site: continuous observation of the thickness of the sheeting, the surface-proof slide-to-board interface structure with the on-site drainage, ground-based soft spot and border transition processing, with timely review in case of anomalies.

Landing steps

Access to temporary sites for site drainage, ground-based soft spots and border transition processing.How temporary activity sites are first marked for ground composition, water-bearing status and basic stress capacity, and are re-intensified for traffic density, operating speed and multiple shifts.How to run a round of temporary activity sites, compared with the round.How temporary sites can be expanded if they are stabilized for the first time;If the first round is rounded, the shift is back.The total quality of the vehicle is added to the work schedule for each axle when there is a shift change in the temporary space.The temporary activity site will look first at the mileage of the operating route, the condition of the vertical slope, the sharp bend position and the cross-crossing point, and then the thickness of the sheet, the surface-proof scheme and the inter-board interface structure.

How do you verify the effect?

The temporary activity site will first look at the total quality of the vehicle and the strength of each axis, then at the mileage of the operating route, the conditions of the slope, the sharp bend position and the crossing point.The second round of the temporary activity site will look at the location against the thickness of the sheet, the surface-proof skating pattern and the inter-board structure.How temporary activity sites can be localized if ground composition, water-bearing status and basic stress capacity are stable and on-site drainage, ground-based soft spots and border transition treatment are stable.How temporary activity sites are brought back together in terms of traffic density, speed of operation and multiple shifts.The site of the temporary activity is pre-empted, ground-based soft spots and border transitions, with a view to ground composition, water-bearing status and basic stress capacity.How temporary sites can be re-assessed would allow for less movement.

Common deviations

How the temporary activity site is wrong is one: it depends only on traffic density, speed of operation, and whether it has been turned over several times. How the temporary activity site is wrong in the second area: it ignores the total mass of the vehicle and the strength of each axis. How the temporary activity site is wrong in the third area: it treats the composition of the ground, the water-bearing state and the basic stress capacity as constant.

How do I communicate with the procurement?

The request for a temporary site is accompanied by physical photographs, bulk size, and information about the arrival.How temporary activity sites are packaged for both the project cycle and the delivery.How the temporary activity site does not specify the mileage of the operation route, the conditions of the vertical slope, the sharp bend position and the cross-crossing point, and the project map is updated after the change.How the temporary activity site re-approves the acceptance and inspection terms and the order version before shipment.How the temporary activity site would first measure the total mass of the vehicle and the strength of each axle would then be processed in a transition from the field drainage, ground-based soft spots and the edges.How the temporary site could be reduced to less repair.

Conclusions

How the temporary activity site works is not a one-size-fits-all. How does the temporary activity site determine the total quality of the vehicle and the capacity of each axis, and then test the ground composition, water-bearing state and basic stress capacity?

Article label: Ground Protection MatsConstructionActivities and lawn