Jiachuang Plastics

How can coal transporters reduce the winter freezer?

The freezing of water-bearing coal during cold-temperature parking, the analysis of the reasons for the long waiting period for the formation of the ice sheet between the material and the compartment, and the presentation of options, installation, inspection and procurement proposals for a combination of low friction liners, swing beats and compliance anti-freezing management.

Contact Us
Abstract of article:The freezing of water-bearing coal during cold-temperature parking, the analysis of the reasons for the long waiting period for the formation of the ice sheet between the material and the compartment, and the presentation of options, installation, inspection and procurement proposals for a combination of low friction liners, swing beats and compliance anti-freezing management.

To answer how coal transporters can reduce the winter freezer, it would be better to observe from a full operating cycle than to look at static photographs. For example, when water-bearing coal is frozen during a cold-temperature parking, loading, driving, turning, stopping or lifting change the stress, and long waiting periods for materials and compartments to form an ice layer tend to occur only in an action. To match the movement to the anomaly, we can find effective improvements.

The selection could be in three steps: the first step would be to verify the type of material, water content rate, particle size, temperature, load, car angle and current residue rate; the second step would be to convert long waiting periods to ice formation into carrying, friction, shock or grinding needs; and the third step would be to implement a combination of low friction liners, swinging beats and compliance anti-freezing management. The request for quotation documents should indicate the frequency, life expectancy and maintenance of the slabs. The increase in thickness usually also increases weight and handling difficulties and therefore cannot automatically be equated with “more suitable”.

The water-containing coal freezes the actual scene during the cold parking.

Figure: Water-containing coal frozen during cryogenic parking

The quality of the installation should be reviewed through photographs and measurements, not just oral confirmation. First, it handles drainage, tatters or deformation steel plates, and then places the skating of cars on approved drawings; the low friction liner is to be used with the correct lifting and clean-up system. Any need for temporary blocks of wood, random cutting of angles, forced porosity or stacking should be returned to the technicians for re-evaluation.

A shorter review cycle could be used at the beginning of the operation to confirm that the product has stabilized and is adjusted. The inspection consists of seams, sudden slips, de-loading and lifting anomalies, as well as observation of the operator ' s compliance with speed limit, lift or removal requirements. Deep mouths, burns, permanent warp, loose-stretched solids and perforations are expanded and photo measurements should be made; parts that meet the decommissioned conditions must be placed in separate lists.

If the project is ready to expand its application, it is recommended that it be preceded by a common review of operations, maintenance, security and procurement. Operators confirm the ease of use, maintenance staff confirm the feasibility of inspection and replacement, security personnel check the conditions for decommissioning, and procurement staff deliver spare parts in comparison with spare parts. Multiple views test whether the combination of low friction liners, swing beats and compliance anti-freezing management is truly implementable outside paper.

The ultimate goal is not simply to install a product, but to keep the water-bearing coal frozen and operating at acceptable risk during the cooling period. Approval of the programme should be accompanied by the use of restrictions, inspection responsibilities, decommissioning criteria and evacuation methods. Thus, even if there are changes in personnel or shifts, the lack of information does not trigger a resumption of long waiting periods for materials and carriages to form ice.

Article label: Mines, quarrying and drilling

Need for further evaluation of the actual project?

Applications, sizes, quantities, site photographs or drawings and delivery destinations are sent, on which we can identify more suitable products and processing programmes.