How do you check a leg cushion after the mine's hanger?

(c) Conducting a check around the exit site following the heavy-loading of the crane to decipher the causes of the fine cracks, crush marks and hole damage that may affect the next mission and to give selection, installation, inspection and procurement recommendations for the post-cleaning check level, edges, posts and the establishment of retroactive records.

Contact Us
Abstract of article:(c) Conducting a check around the exit site following the heavy-loading of the crane to decipher the causes of the fine cracks, crush marks and hole damage that may affect the next mission and to give selection, installation, inspection and procurement recommendations for the post-cleaning check level, edges, posts and the establishment of retroactive records.

It is recommended that a short question statement be established on how to check the leg pads after the suspension of the mine has ended: the site is a post-heavy extraction site inspection, with the main anomalies being the fine cracks, pressure marks and hole damage that may affect the next mission, who is the target and when recovery is necessary. This distinguishes between security issues that must be immediately isolated, control issues that can be maintained, and long-term issues that need to be redesigned.

The selection may be in three steps: the first step is to verify the work of the crane, the length of the arm, the point of return, the maximum retrogression of the leg, the size of the foot and the ground-based load; the second step is to make it possible for the next mission to be converted into a load, friction, shock or grinding demand; and the third step is to perform a post-cleaning check of the flatness, edges, posts and to establish a traceable record. The request for quotation documents should indicate the frequency, life expectancy and maintenance of the leg pads. The increase in thickness usually also increases weight and handling difficulties and therefore cannot automatically be equated with “more suitable”.

Reload and exit field check for actual scenes

Figure: Escape inspection after reloading

The product and field base should be used as a system for acceptance and acceptance when landing. The leg pad extended the area of stress but could not repair the unsatisfactory foundations. Once the laying, support or lining is completed, full contact, flatness, edge transition, tight state and interference with tyres, feet, lifting bodies are checked; the pilot operation begins with low-risk work and is gradually restored to the planned capacity after the site manager has confirmed that there are no anomalies.

The site inspection should not simply be “normal”. Deposition, slide, edge distance and underground facilities should be selected on a case-by-case basis and anomalies should be classified into three levels of observation, restriction and decommissioning. In the event that repeated cracks, crushes and hole damage in the same area may affect the next mission, a complete engineering worksheet should be created. The removed plates or pads are cleaned, dry, flat and stored in salaried areas.

In order to validate the programme, a representative route, a vehicle or a support point could be selected for a controlled trial, with observation cycles and exit conditions. The records should cover normal and most unfavourable work situations, with particular attention to the possible impact of fine cracks, pressure marks and perforations on the next mission. Only when the test data are stable, the maintenance workload is acceptable and confirmed by project management and security personnel will it be appropriate to expand the application.

Finally, this paper provides a selection and management approach, with no alternatives to equipment specifications, special programmes, geological evaluations and local regulations. Work involving lifting support, ramps, ditches, vehicle lifts or personnel entering the carriage shall be reviewed and quarantine, locking and emergency procedures carried out by suitably qualified personnel. The above data may be submitted at the request for quotations to obtain recommendations on size, thickness, quantity and shipment.

Article label: Mines, quarrying and drilling

Need for further evaluation of the actual project?

Applications, sizes, quantities, site photographs or drawings and delivery destinations are sent, on which we can identify more suitable products and processing programmes.