How can we speed up the demolition of large music festival pavements?

The fact that hundreds of plates need to be recovered in a short period of time would reduce the efficiency of the mix of analysts, forklifts and transporters and indicate the selection, installation, inspection and procurement elements for the delineation of demolition, cleaning and loading areas and the use of numbered lists.

Contact Us
Abstract of article:The fact that hundreds of plates need to be recovered in a short period of time would reduce the efficiency of the mix of analysts, forklifts and transporters and indicate the selection, installation, inspection and procurement elements for the delineation of demolition, cleaning and loading areas and the use of numbered lists.

Hundreds of plates need to be recovered in a short period of time, seemingly only one road to be paved, which is actually related to drainage, vehicle movement, site protection and evacuation plans. Answering how to increase the speed of the demolition of the large music festival pavement, on-site positioning and photographing of people, forklifts and transport vehicles would be inefficient and would confirm the frequency of occurrence, the impact on the target and the permitted recovery time.

The procurement staff should provide the remaining vehicles, areas to be dismantled, cleaning conditions, load sequences, site acceptance and storage status with site photographs, and indicate where the mixing of personnel, forklifts and transport vehicles would reduce efficiency. The programme can begin with the delineation of the demolition, cleaning and loading areas and the use of a numbered list, requiring suppliers to indicate the number of the material, the grade of the finished product, the basis of testing, the conditions of limitation and the boundary of quality protection.

Hundreds of plates need to be recovered in a short time.

Figure: Hundreds of plates need to be recovered in a short time

Prior to implementation, the area of operations should be sealed to remove sharp stones, wooden stakes and miscellaneous items that would cause spot loads, repair deep-pit tracks and remove drainage. Quick-evacuation sites rely on reverse planning, numbering and zoning operations rather than being looted at the same time. The planks are to be aligned to the main traffic, with an appropriate extension of coverage at the bend and docking points; and the leg mats must be fully exposed and inert, and should not be filled with random stacking or field cutting.

Special inspections are added in case of severe weather or equipment anomalies. Fixed angle photographs and position markings are used for plate numbers, injuries, pollution, lawn mosaic marks, pallets and delivery records to facilitate comparison of depositions and shifts. It is prohibited to clean the surface of a polymer with fire, violence or sharp instruments to avoid new damage.

Before expanding the application, it was recommended that a common review of operations, build-up, HSE, site and procurement be undertaken. The parties confirm the conditions of movement, inspection, site protection and delivery, and can test whether the designation of areas for demolition, cleaning and loading and the use of a numbered list are truly enforceable.

The conclusions can be summarized as the first confirmation of the boundary, then the layout of the pavement, followed by the inspection and validation of the project data. Formal programmes should also identify the use of restrictions, duty-bearers, decommissioning criteria and evacuation methods to avoid the loss of information as a result of shifts or changes in contractors.

Article label: Events, performances and temporary venues