The same road map needs to be used by the host, site and builder of the event for the determination of the area to be covered by the plaque for the stage roof. In the case of car hangers, for example, stage hangers and sound hangers, if the teams plan for each, it is easy to get the vehicle into unprotected areas and triggers the maximum reversibility of the leg that may exceed the temporary site load. Only when the boundaries and responsibilities are harmonized will there be a clear basis for product allocation.
Four cores can be used for “site-equipment-product-operated”: site and equipment column to record the total mass of equipment, maximum leg reaction, suspension, ground endurance, underground facilities and weather windows, product column to specify sizes and connections, and operating column to calculate the minimum support area using equipment plant reaction and confirmed field durability. Any one still relies on speculation, with the possibility that the maximum retroactivity of the leg may exceed the temporary site load at the peak of activity.

Figure: Automobile slings with stage hangers and sound hangers
Prior to implementation, the area of operations should be sealed to remove sharp stones, wooden stakes and miscellaneous items that would cause spot loads, repair deep-pit tracks and remove drainage. The pavements are for passage and the mats for extension of the feeder, which cannot be replaced by one another. The planks are to be aligned to the main traffic, with an appropriate extension of coverage at the bend and docking points; and the leg mats must be fully exposed and inert, and should not be filled with random stacking or field cutting.
The inspection should not only be “normal”, but should be identified on a case-by-case basis around sedimentation, horizontality, full exposure, edge distance and connectivity, with anomalies divided into three levels of observation, restriction and decommissioning. In the same area, the highest reoccurrence of the maximum reversibility of the leg may exceed the carrying of the temporary site, requiring a return to drainage, ground, transport or re-analysing of specifications rather than the constant replacement of surface components.
The impact assessment cannot be based solely on the success of the day. A comparison can be made between the number of incoming waits, the number of crashes, the amount of lawn repairs, the hours of cleaning, the loss of connections and the time of evacuation, and the differences between weather and traffic are recorded simultaneously. Only if the data are stable and the maintenance burden is acceptable will the programme be suitable for replication in the follow-up activities.
This paper provides a selection and management approach that does not replace equipment specifications, interim structural programmes, ground-based evaluations and local regulations. Work involving lifting support, underground facilities, vehicular roll-backs, public traffic or access to dangerous areas shall be reviewed and quarantine and emergency procedures implemented by persons with appropriate qualifications. The above data can be provided in the request for quotations to obtain recommendations for size, thickness, quantity, packaging and shipment.
Need for further evaluation of the actual project?