The same road map needs to be used by the organizers, sites and builders of the event. In the case of incoming vehicles, which already leave deep silos on the unprotected ground, if they are planned separately by the teams, it is easy to get vehicles into unprotected areas and triggers the suspension or distortion of the plates to cause error and damage. Only when the boundaries and responsibilities are harmonized will there be a clear basis for product allocation.
The key to this topic is not to choose the thickest, but to establish a match. (b) Identification and control of the condition based on rainfall, drainage direction, water content of the soil, depth of soft spots, vehicle loads and recovery time limits, and the laying of a continuous layer of laid-down pavement by refilling and identifying basic support. If products need to be moved more frequently, manual weights, posts, stacking and cleaning should also be added to the total cost.

Figure: Entering vehicles have left deep troughs on unprotected ground
The construction organization is as important as the product specifications. Operators shall use means of transport suitable for a single mass, and the vehicle shall be directed by a commander and shall not be braked, wheeled or pressed. The pavement is a temporary layer and cannot be a substitute for drainage and substandard grass-roots treatment. Prior to the opening of public areas, access transitions, trip risks and fence segregation are also checked.
The inspection cycle should be shortened at the beginning of the operation and the product should be stabilized and adjusted for risk. The focus is on water accumulation, pumping mud, sank, edges, connectors and road shoulders, and on the driver ' s compliance with speed limits and shift requirements. Loose connectors, deep mouths, abnormal arctic arctics, or strip shifts should be immediately photographed and closed.
The full life cycle costs include procurement or lease, transportation, laying, inspection, cleaning, maintenance, warehousing and site restoration. Once data are created around the emptiness or distortion of the plate, which would result in faulty and damaged platforms, the project will determine whether it is really cost-effective to fill back and confirm the primary support, and then lay the continuous layer.
The security floor must not be reduced by the tight opening or evacuation time. In the event that the sheet is emptied or distorted, the faulty and damaged table is isolated and the cause identified before a decision is made to repair or reroute. Any improvement must avoid introducing new risks of slide, trip, overload or human conflict.