Jiachuang Plastics

What about the concert generators and the power drive?

Operating close to the backstage around generators, fuel and cable vehicles, analysing congestion, leaks and vehicular roll-backs increases ground and safety risks and explains the selection, installation, inspection and procurement elements of the supply, parking and cable crossing points into the traffic organization.

Contact Us
Abstract of article:Operating close to the backstage around generators, fuel and cable vehicles, analysing congestion, leaks and vehicular roll-backs increases ground and safety risks and explains the selection, installation, inspection and procurement elements of the supply, parking and cable crossing points into the traffic organization.

When discussing how the concert generators and power vehicle corridors are planned, a distinction should be made between surfaces, equipment support and personnel access. The close proximity of generators, oil and cable vehicles to the backstage may contain three requirements at the same time, and congestion, leaks and vehicular roll-backs increase ground and safety risks that are magnified by overloading traffic. The division of the site into different functional areas is the first step in determining the product, thickness, width and quantity.

The selection can be divided into three steps: first to verify the maximum vehicle axle load, tyres, turn radius, handling rhythms, grassland water content and night lighting, then to convert congestion, leaks and vehicular reverses into carrying, stabilization, smoothing or site restoration requirements, and finally to implement the integration of supply, parking and cable crossing points into the transport organization. Common 15, 20, 25 or 30 mm specifications can only serve as the starting point for the request for quotations, and the final option is to be confirmed in conjunction with the location of the vehicle and the base support.

Operation of generators, fuel trucks and cable vehicles close to the backstage

Figure: Generators, fuel trucks and cable vehicles operating near the rear

In the event of a shortage of space on the ground, work cannot be done by reducing the necessary coverage or moving the equipment feeder to the road shoulder. Stations and set-up of vehicles should be reordered so that supply, parking and cable crossing points are included in the transport organization with sufficient work space. The concert's roads must be accompanied by heavy transport, isolation and emergency passage. The continuity of routes is reviewed after each change in traffic organization.

Special inspections are added in case of severe weather or equipment anomalies. Use of fixed angle photographs and position markings for seams, edges, turn areas, loading points and viewer junctions to facilitate comparison of sedimentation and shift. It is prohibited to clean the surface of a polymer with fire, violence or sharp instruments to avoid new damage.

The quotations for the different products should be compared under the same size, material, connection, packaging, delivery and test basis. Supplementary information should be requested if the supplier gives the maximum carrying figures without indicating ground and test conditions. The event scene requires more attention to reuse, removal and quick evacuation than to single laboratory indicators.

The security floor must not be reduced by the tight opening or evacuation time. When congestion, leaks and vehicular roll-backs increase ground and safety risks, they are isolated and caused before a decision is made to repair or reroute. Any improvement must avoid introducing new risks of slide, trip, overload or human conflict.

Article label: Events, performances and temporary venues

Need for further evaluation of the actual project?

Applications, sizes, quantities, site photographs or drawings and delivery destinations are sent, on which we can identify more suitable products and processing programmes.