In the wind blades, tubes, cabin transport and wind cranes, the focus of this topic is on “how to inspect temporary roads before wind electrical equipment is transported”, which does not appear to mean that there is a continuous support under the plate. For the inspection of temporary roads prior to the transport of wind and electricity equipment, the condition of the ground, the weather and the most heavy vehicle should be recorded before entering the field, as the grade change of the equipment level may occur after repeated traffic due to the overload or uneven deposition of the branch. The establishment of baseline photographs and measurement points will facilitate follow-up inspections and recovery of acceptances.
The input information can be organized by the four columns of equipment, ground, route and time, with an emphasis on the profile of the van, the axle, the minimum turn radius, the road slope, the maximum reversibility of the leg, the earth's durability and the weather window. To change the level of equipment in terms of overloading or uneven deposition at the nodal points, it is proposed to manage on-site changes using approved road maps, numbering and inspection records. In the case of leg pads, the maximum repulsive force of the leg provided by the plant must be obtained, and in the case of passage roads, the total weight of the vehicle, the axle, the tyre and the complete turn track should be used. In the case of “how to inspect temporary roads prior to the transport of wind and electricity equipment”, the information review should also confirm when the operational equipment docked, the location of the feeder points and the area of separation of personnel, and include missing information as an item to be confirmed in the quotation and construction programme.

Figure: Wind blades, pylons, cabin transport and wind hanger sites, with a focus on “how to inspect temporary roads before wind and electrical equipment is transported” (initiative material for the plastic network).
In the absence of space on the ground, work cannot be undertaken by reducing the necessary cover or moving legs to the shoulder of the road. Stations and construction should be reordered to provide sufficient space for “managing on-site changes with approved road maps, numbers and inspection records”. Wind and electricity transport and suspension must control the continuity of the road and the carrying of the feeder, respectively, and any nominal tonnage must be returned to the ground and equipment condition. Any forced overlays of holes, temporary mats or uncounted should be returned to the technical manager for evaluation. Test-painting records for “how to inspect temporary roads prior to transport of wind and electricity equipment” should indicate the starting and ending location, vehicle condition and release conclusions to facilitate review as construction conditions change.
The inspection cannot simply be “normal” and should be organized around the inside and outside of the bend, the wrong plate, the deformation of the road shoulder, the deposition of the legs, the horizontal level, the connectors and the accumulation of water, and should be divided into three levels of observation, restriction and decommissioning. For critical points resulting from approved road maps, numbering and inspection logs to manage on-site changes, fixed photo angles and measurement benchmarks should be established. A loose connection, a permanent deformation, a breach through or a deviation of a branch shall be immediately isolated. The inspection form, which revolves around “how to inspect temporary roads prior to the transport of wind and electricity equipment”, requires that the change in the level of the equipment be overloaded or uneven by a single branch, with an indication of the inspector and the time of return.
It is recommended that a key route or a feeder of equipment be selected for controlled validation, with observation cycles and exit conditions. The records are to cover normal and most unfavourable conditions, with particular attention to overloading or uneven deposition of the branch points to change the level of equipment. A further expansion after the trial could reduce one-time procurement or full-line errors, while providing the same basis for vendor comparison. It should also answer whether the “how to check temporary roads before wind and electrical equipment is transported” has been certified for improvement by managing on-site changes using approved road maps, numbering and inspection records, avoiding a subjective description alone.
This paper provides a selection and management approach and does not replace the equipment instructions, the suspension programme, ground-based evaluation or local regulations. Work involving lifting support, underground facilities, electrical areas, the edges of trenches and the entry of persons into dangerous areas shall be reviewed by persons with appropriate qualifications. The above parameters may be provided in the request for quotations to obtain recommendations for size, thickness, quantity, packaging and shipment.